Working Experience / Professional Practice

 

Contract Researcher – Gammon-Nishimatsu Joint Venture

 

 

Consultant – High Point Rendel Hong Kong Limited

 

 

Dragages et Travuax Publics

 

 

Freyssinet Hong Kong Limited

 

 

Vincent Ip & Associates

 

 

Marples International Limited

 

Projects

 

2003 – Present

Contract Researcher – Gammon-Nishimatsu Joint Venture

Carrying out some researches with respect to the recoverable price for a design and build project, aiming to minimize the dispute on price submission for the project

 

KCRC East Rail Extensions

 

Contract No. HCC 300 East Tsim Sha Tsui Station

 

1997 – 2003

Consultant – High Point Rendel Hong Kong Limited

Provided contractual and commercial assistance to local contractors and sub-contractors involved in building and civil engineering works.  This involved contract administration, quantity surveying, cost engineering services, negotiation of final accounts and preparation of claims, and preparation of backup for arbitration

 

Cathy Pacific Hotel Development

 

Deluxe Residential Development Project

 

Stanely West Point, Western District

 

 

Po Kwong School, Fanling

 

 

Yat Tung Estate, Tung Chung

 

 

Landslip Preventative Measure, HK island

 

KCRC Extension, Hung Hom Station

 

1996 – 1997

Dragages et Travuax Publics

 

Contract administration of specialists’ contractors working on the Hong Kong Convention Exhibition Centre Extension. 

 

1993 – 1996

Freyssinet Hong Kong Limited

Involved in almost all aspects of quantity surveying works in respect of the soil investigation, stabilisation of slope profiles, mini-piles, underpinning, rail-tracks improvement, pre-stressing concrete, post-tensioned anchors monitoring, and underground drainage repair works.  My experience inter-alia covered estimating and cost and value reconciliation

 

Ma Wan Bridge

 

Underground Railway Repairs

 

Cap Shui Bridge

 

China Light Power Co Ltd

 

 

Kwai Chung, Route 3

 

 

 

1987 – 1991

Vincent Ip & Associates

Participated with Design issues (from feasibility to completion stage); Management of  Local Authority approvals and permit procedures; Selection of the contractors, suppliers, and materials; Preparation of contract and cost estimates; and Compliance with the M&W specification of the project works

 

Garden Bakery Building, Sham Tse

 

Residential Building, Hoi Tan Street

Harbour Industrial Trading Centre, Ap Lei Chau

 

 

 

 

 

 

1986 – 1987

Marples International Limited

 

The project involved open cut excavation (with blasting), borrow areas with profiled construction, reclamation, marine monitoring, box culvert and retaining wall construction.